This is 448 units telecom generator project in Peru which happened in 2017 to 2019.
We design a special control system-two as one group and automatic transfer to another gensets every 12 running hours to extend the gensets life, much longer.
Controller ComAp AMF25 with remote control, ATS and other strong protection system.